Plot Construction Feasibility
- Infrastructure aspects
- Topographic aspects
- Soil characteristics
- Climatic considerations
- Energy efficiency aspects
- Environmental impact
- Health and safety aspects
- Considerations for people
with disabilities
- Preservation of existing or
historical buildings -
Building Restraints
- General and municipal building
legislation (PDM)
- Architectural specific building
restraints (CIS, COS & CAS)
- Specific legislation and regulations
on land use
-
Pre-Construction Drawings and Building Permit
- Building plans and drawings
- Building permit request and regulations
-
Building Execution Plans
- Architectural plans and drawings
- Detailed work plans and drawings
- Feasibility studies
- Scheme designs with costing
- Specification of works
Building Materials
- Selection of building materials and
suitability for application
- Handling and treatment of building
materials
-
Building Progress and Phases
- Building site preparation
- Work yard installation
- Excavation and landfill works
- Building shell
- Building overall completion
- Exterior work
-
Construction Regulations and Standards
- General construction regulations and
standards (ISO/DIN)
- Damp-proofing and vapour barrier
- Thermal insulation
- Acoustic insulation
- Heating and air-conditioning system
- Ventilation system
- Electric wiring system
- Lightning rod system
- Sound and video system
- Fire protection system
- Automation, regulating and control
system
Building Specifications
Building Tender
Quotation Analysis
Acceptance and Awarding
of Contract
Drawing up of Building Contract
-
Supervision of Construction Performance and Execution Quality
- Checking of construction execution in
accordance with contract
- Checking of building material use in
accordance with contract
- Checking of building material
processing in accordance
with instructions
- Observance of safety and hygiene
standards
- Records of construction progress
including digital photo album
-
Construction Coordination
- Convening of construction meetings
and compiling of minutes
- Coordination of specific building
works
-
Building Progress Chart
General and Technical Translations
-
Construction Payment Schedule
- Staged instalments linked to
construction phases
- Control of staged payment dates
-
Expert Reporting
- Identification and analysis of defects
- Measures to correct construction defects
- Cost estimates for correction of
construction defects
-
Technical Building Documentation
- Technical drawings and scheme designs
- Specification of works
- User manuals